Licensed Professional Engineers |
Search/

Request a free quote

Selected Projects

Arc Flash Safety Training and Electrical Panel Survey at a Manufacturing Plant, Weimar (2026)

We typically respond within one business day.

Project at a glanceDE-PRJ-10882

Location
Weimar, TX
Service
Arc flash training, arc flash study
Client
Confidential

Arc Flash Safety Training and Electrical Panel Survey at a Manufacturing Plant, Weimar (2026)

In 2026 a manufacturer asked us to update the arc flash work at its plants and to train the people who work on the equipment. At the Weimar plant that meant a survey of 109 electrical panels and a training session that ended with a written test.

The panel survey

An arc flash model is only as good as its equipment list. At Weimar we listed every panel by number, area and voltage across six parts of the site: the front building, the middle electrical room, the back corner room, the middle processing area and the plastics and mill buildings outside. Of the 109 panels, 60 are 480 V and 49 are 208 or 240 V, serving areas such as the rubber hall, urethane, press lines, assembly cells, the machine shop and shipping. Models for the plants in Conroe and Willis were set up in the same software.

The training

The session follows NFPA 70E® and IEEE® 1584 and usually runs under four hours, starting with a pre-test. It covers shock and arc flash hazards, approach and arc flash boundaries, how to read an arc flash label, and what separates a qualified from an unqualified person. It then works through the employer electrical safety program: job safety planning and briefings, lockout and tagout, and the steps to establish and verify an electrically safe work condition. PPE selection covers gloves, insulated tools and clothing, and the last part reviews the 2018 changes to IEEE® 1584 and recent changes to NFPA 70E®. Retraining is required at intervals of no more than three years.

Testing

Attendees wrote their answers by hand on their own sheets. Staff at Weimar and at a second plant of the same manufacturer completed the written test.

Related services

Training goes with our arc flash studies, and the panel lists come from the same field work as our walkdowns and as-built drawings.

Get your project started

We typically respond within one business day.

Request a free quoteor call (866) 621-6920