Short Circuit and Arc Flash Studies for a Contractor Power Distribution System at Two Seattle Sites (2018 and 2021)
A contractor asked us to model the electrical system that feeds its power control unit at a site in Seattle, Washington. We built the short circuit and arc flash model in January 2018, updated it in April 2018 and ran it again in June 2021 for a second Seattle site.
The system
At the first site the utility supplied 26 kV, with about 25 kA of available fault current, through a 750 kVA transformer to a 480 V bus. An 800 A fused disconnect and a 1,400 A molded case breaker fed an 864 kVA transformer inside the power control unit, with a 600 V secondary. Three 600 A fused outputs fed step-down transformers in the field, and smaller fused circuits served two loads of about 60 kVA and 31 kVA.
What the model showed
The January run found about 11.8 kA of bolted fault current on the 480 V bus. Faults on the 600 V secondary were cleared only by the 480 V disconnect fuses, and the incident energy there came to 25.1 cal/cm2 at 18 inches, with 15.1 cal/cm2 at the unit primary. In the April update the unit main contactor is shown as the clearing device for the 600 V buses, with a total clearing time of about 8.8 cycles, and the incident energy on those buses dropped to about 2.1 to 2.2 cal/cm2. The same update put the highest value, 31.5 cal/cm2, at the primary of a control transformer protected by the disconnect fuses. Where the bolted fault current or voltage fell outside the IEEE® 1584 empirical range, the software used the theoretical Lee method.
The second site
For the 2021 site the model was run with the unit at a 0.3 kV secondary and three step-down transformers. Results ranged from under 1 cal/cm2 at the small fused loads to 34.1 cal/cm2 at the control transformer primary. Because the unit output voltage can be changed in the field, a separate worksheet compared the incident energy at the transformer secondary and at the step-down transformer primaries for settings from 0.1 to 0.6 kV.
Deliverables
Each study included the one-line diagram, momentary and interrupting duty reports, protective device settings, time current curves and the arc flash summary used to print the equipment labels.
Related services
This work combines our arc flash studies, short circuit analysis and protection coordination.
Electrical power
Related projects
League City, TX
Data Center Arc Flash Study and Walk-Down, League City
Arc flash, coordination, short circuit
Grapeland, TX
Four-Area Plant Arc Flash Studies, Grapeland
Arc flash, short circuit
Bayou Vista, LA
Industrial Facility Arc Flash Study, Bayou Vista
Arc flash, coordination
Get your project started
We typically respond within one business day.