Selected Projects
Galvanic Anode and Test Station Upgrades on a Municipal Water Transmission Line Between Edna and Placedo (2018 to 2019)
We typically respond within one business day.
Project at a glanceDE-PRJ-10880
- Practice
- Corrosion and CP
- Location
- Edna, Victoria and Placedo, TX
- Service
- CP installation support, test stations
- Client
- Confidential
Galvanic Anode and Test Station Upgrades on a Municipal Water Transmission Line Between Edna and Placedo (2018 to 2019)
From May 2018 to March 2019 our corrosion engineer worked in the field with the installation crew on cathodic protection upgrades to a municipal water transmission line. The work ran from Edna through Victoria, Bloomington and Placedo to McFaddin, with the city inspector on site.
New anodes at existing test stations
At each anode location the crew took as-found readings, marked the anode positions and drilled the anodes in: eight at one test station in late May 2018, eight at another in early June, four at a third and the remaining five at a fourth in mid June. At one site the water line was 10 feet deep, so the anode bottoms went to about 15 feet per the typical detail. The soil there was clayey sand to 5 to 10 feet over sand, and our daily report noted that the drawings placed the anodes in the sand layer, which is not ideal for long term anode performance. Where a new pipe connection was needed, the crew exposed the pipe, located a joint, chipped the mortar, prepared the surface, welded steel clips, coated the bare metal with mastic and grouted it, then took readings before and after connecting the anodes.
Working around other pipelines
At one groundbed three industrial gas lines turned out to be farther east than the drawings showed, so the anodes had to go farther east, with an estimated 25 to 50 feet of extra wire. Another pipeline operator required 24 inches of vertical separation, which conflicted with the 18-inch header depth in the design, and work at that crossing stopped until a path forward was agreed. Operator representatives watched the drilling and backfill near their lines.
Test station replacements
In August 2018 we located the stations to be replaced, logged GPS positions for the one-call locates and then excavated and replaced old test stations, up to four in a day. Stations that already had a metal post, a new test head and a concrete collar were skipped at the direction of the city. Along the way the crew repaired high resistance connections by splicing, found a wire, likely an old anode header, cut underground and reported suspect structure leads to the city. Two more stations were replaced in November 2018, and punch list work in March 2019 replaced posts, terminal boxes, marker posts and one concrete collar.
Related services
We design and install cathodic protection systems, test them at start-up and commissioning and survey them afterward with potential surveys.
Corrosion and CP
Related projects
Austin, TX
Gas Line Holiday Testing, CP Start-Up and a Chilled Water Survey, Austin
Holiday testing, CP start-up, CP survey
North Dakota
North Dakota Energy-Sector Cathodic Protection
Cathodic protection
El Paso, TX
Power Station Impressed Current CP, El Paso
CP design, installation
More work in: Texas
Get your project started
We typically respond within one business day.