Selected Projects
Corrosion Condition Assessment of an Aging 60-Inch Raw Water Line, With Close Interval and Interference Testing, Houston (2015 to 2016)
We typically respond within one business day.
Project at a glanceDE-PRJ-10886
- Practice
- Corrosion and CP
- Location
- Houston, TX
- Service
- Condition assessment, CIS, interference testing
- Client
- Confidential
Corrosion Condition Assessment of an Aging 60-Inch Raw Water Line, With Close Interval and Interference Testing, Houston (2015 to 2016)
An aging 60-inch raw water line in Houston, running from a water purification plant to a bayou crossing, was due for a condition assessment. Working under the prime engineering firm in 2015 and early 2016, we tested the soil, the pipe and its electrical surroundings, and found signs of stray current near a crossing of several energy pipelines.
Soil and pipe
In March 2015 we ran Wenner four-pin tests for a pipe depth of 10 to 15 feet, and an electromagnetic conductivity survey to pick the sample locations. Three samples taken near pipe depth went to a laboratory in April: as received they measured 2,280 to 12,000 ohm-cm, saturated 1,160 to 1,600 ohm-cm, with a pH of 7.8 to 8.9. Continuity tests over nine segments between test stations put the measured resistance at 0.30 to 0.95 of the theoretical value, below the 1.2 ratio the test form treats as a failure, so the pipe joints were carrying current. Test station potentials ranged from -664 to -1,120 mV.
An unexpected reading
The close interval survey in June 2015 logged 1,222 readings along about 5,500 feet of the line. Potentials ran from -570 to -1,300 mV, far more negative than expected for an old line with no cathodic protection of its own, and they grew more negative from a valve house toward an industrial facility. The peak, -1,300 mV, sat at an underground crossing of several energy pipelines. The localized pattern pointed to stray current picked up from one or more of those lines.
The joint interference test
We wrote the test protocol, and the owners of the crossing pipelines agreed to a joint test. On January 22, 2016 their rectifiers in the area were interrupted on a 3 second on, 1 second off cycle while we ran short close interval surveys from two connection points on the water line, at a valve house and at an air release valve. The water line potentials shifted by about 23 to 57 mV between the on and off cycles, the kind of evidence needed to trace where the current returns and to plan mitigation with the operators.
Related services
This assessment drew on our close interval surveys, interference testing, soil corrosivity analysis and pipeline integrity assessment.
Corrosion and CP
Related projects
Oklahoma City, OK
Oklahoma City Stray-Current Investigation
Interference testing
Wink and Sarita, TX
AC Interference Data Logging on Texas Pipelines
AC interference testing
El Paso, TX
Power Station Impressed Current CP, El Paso
CP design, installation
More work in: Texas
Get your project started
We typically respond within one business day.