Licensed Professional Engineers |
Search/

Request a free quote

Selected Projects

Cathodic Protection Testing and Joint Bonding Materials for New City Water Mains, Fort Worth (2018) and San Antonio (2022)

We typically respond within one business day.

Project at a glanceDE-PRJ-10839

Location
Fort Worth and San Antonio, TX
Service
Construction phase CP testing, joint bonding
Client
Confidential

Cathodic Protection Testing and Joint Bonding Materials for New City Water Mains, Fort Worth (2018) and San Antonio (2022)

Cathodic protection on a new water main is easiest to put right while the line is still under construction. These two small jobs, four years apart, came from contractors building city water mains.

A test before the line was finished, Fort Worth

In September 2018 a general contractor asked us to inspect and test the CP system on a new 16-inch water line, about 1,800 feet of polyethylene-encased ductile iron pipe, built as part of a city water improvement project. We visited the site on September 27. Three of the four specified test stations were in place: two anode test stations and one insulating joint test station. Every CP lead and connection was intact after backfill, the pipe between the first and third stations was electrically continuous, and the insulating flange kit at the start of the line worked. The two anode test stations were missing the current shunts shown on the drawings, so we connected each anode bed through a test shunt and confirmed that the anodes were working.

We asked for two more steps once construction was complete: test the second insulating joint and the continuity of the last segment of pipe, and, after the shunts were installed and the pipe had time to polarize, run a potential survey to confirm the system.

Joint bonding materials, San Antonio

In January 2022 we prepared the joint bonding materials submittal for a water main extension built for the water utility in San Antonio. It listed 700 feet of No. 2 AWG stranded copper bond cable with THHN insulation, 800 exothermic weld cartridges, 700 weld caps with primer, 16 horizontal weld molds sized for 30-inch pipe, two weld control units, and petrolatum tape, mastic and paste to coat the connections.

Related services

More on this kind of work under start-up and commissioning, and on later testing under cathodic protection potential surveys.

Get your project started

We typically respond within one business day.

Request a free quoteor call (866) 621-6920