Corrosion Control Design and Construction Support for Family Housing on Kwajalein Atoll, Marshall Islands (2023 to 2026)
We typically respond within one business day.
Project at a glanceDE-PRJ-10879
- Practice
- Corrosion and CP
- Location
- Kwajalein Atoll, Marshall Islands
- Service
- Corrosion control design, coatings
- Client
- Confidential
Corrosion Control Design and Construction Support for Family Housing on Kwajalein Atoll, Marshall Islands (2023 to 2026)
Kwajalein Atoll, in the Republic of the Marshall Islands, is about as hard on building materials as a site can be. For new family housing at the military installation there, we served as corrosion consultant to the design team, wrote the corrosion analysis and coating systems, and have reviewed design changes and contractor submittals during construction.
The environment
The analysis starts from the site: hot temperatures, high humidity, near-constant windblown sea mist, strong UV, occasional flooding and tropical storm winds. It also states a limit plainly. No coating system available today will last 25 years there without maintenance painting.
What the design calls for
For reinforced concrete we recommended four measures: hot-dip galvanized rebar and tie wire, at least 2.5 inches of cover following ACI 357 guidance for harsh marine exposure, a corrosion inhibiting admixture, and less moisture on the concrete, through air conditioned interiors and an impermeable coating on exterior walls and on uncovered interior walls such as the electrical rooms. Outside, parts were specified in nonmetallic materials, 316 or 316L stainless steel or 6061-T6 aluminum, with dissimilar metals avoided. Air conditioning condensers sit in partially enclosed hurricane bunkers, refrigerant lines are copper with a stainless steel jacket and a self-healing wrap where buried, and outdoor circuit boards get a conformal coating. Inside, ductwork and supports are stainless steel, and piping and electrical conduit are PVC.
Coating tables cover steel, stainless steel, galvanized steel, exposed concrete walls and the jacketed refrigerant piping. The analysis favors shop painting, testing steel for soluble salts under SSPC Guide 15 before blasting, stripe coats on edges and welds, and 316 stainless steel fasteners for the roof decking, sealed with the finish coat. We reviewed the design at the 65 and 100 percent submittals.
During construction
In October 2024 the contractor proposed galvanized tie wire in place of the black iron wire in the concrete specification, so that the wire would match the galvanized rebar, as the corrosion consultant had advised. The government accepted it, citing ASTM® A767. When precast concrete was later substituted, the steel for the precast work was set the same way: galvanized reinforcing bar, wire, welded wire reinforcement, inserts, structural steel and bolts. In 2026 we reviewed contractor submittals for rebar, prestressing strand, lifting inserts, connectors and utility components.
Related services
This is the materials side of our corrosion engineering work, together with structural integrity assessment.
Corrosion and CP
Related projects
El Paso, TX
Power Station Impressed Current CP, El Paso
CP design, installation
Denton, TX
Annual Gas Piping CP Surveys at a Power Plant, Denton
Annual CP surveys
Wichita Falls, TX
Fire Water Piping and Tank CP Survey at a Glass Plant, Wichita Falls
CP survey, continuity testing
Get your project started
We typically respond within one business day.