Selected Projects
Three Annual Cathodic Protection Surveys of the Buried Gas Piping at a Power Plant, Denton (2024-2026)
We typically respond within one business day.
Project at a glanceDE-PRJ-8110
- Practice
- Corrosion and CP
- Location
- Denton, TX
- Service
- Annual CP surveys
- Client
- Confidential
Three Annual Cathodic Protection Surveys of the Buried Gas Piping at a Power Plant, Denton (2024-2026)
Small cathodic protection systems are easy to forget between inspections. The buried gas piping at a power plant in Denton is only about 400 feet long, and we have done its CP testing every January since 2024 so that any change shows up early.

The system
Two buried segments carry the gas: a 79-foot main header on the north side of the plant and a 329-foot lateral from the header to the second generating unit to the south. Each segment has its own anode test station, and four insulating flange kits separate the buried pipe from the aboveground piping and plant metal. The system was installed and commissioned by others, and the native potentials from their commissioning report, -631 and -724 mV, are our baseline.
Each January
Every visit follows the same order. We find and test the four flange kits with a radio frequency insulator tester, then read interrupted pipe-to-soil potentials at the two test stations against a portable copper sulfate electrode and compare them on the spot with NACE SP0169. In all three years the four flange kits worked, so the buried segments stayed isolated, and both test points met the -850 mV criterion.
The numbers over three years
In January 2024 the instant off potentials were -1,180 and -1,130 mV. In January 2025 they were -1,086 and -1,141 mV, and in January 2026, -995 and -1,006 mV. The on potentials barely moved, near -1,560 to -1,590 mV each year, while the off readings drifted less negative, by about 185 mV at the first test station and 125 mV at the second. The piping is still inside the criterion, with about 145 mV to spare. A trend like that is the reason for annual testing: it is not a problem yet, and the next survey will show whether it levels off or keeps going.
Each report repeated two recommendations: check the system every two months, and keep the annual survey by a corrosion engineer.
Related services
The survey method is explained under interrupted potential surveys. For gas systems, see gas piping cathodic protection.
Corrosion and CP
Related projects
Central Texas
Low CP Readings on a Crude Pipeline in a Gravel Trench, Central Texas
CP troubleshooting, coupons
El Paso, TX
Baseline CP Surveys at Two Power Stations, El Paso
CP surveys, rectifiers
El Paso, TX
Annual CP Surveys at a Power Station, El Paso
Annual CP surveys
More work in: Texas, Cathodic Protection in Dallas-Fort Worth
Get your project started
We typically respond within one business day.