Load Analysis and Feeder Design for 200 A Lot Upgrades at a Manufactured Home Community, Dallas (2019 to 2020)
We typically respond within one business day.
Project at a glanceDE-PRJ-10847
- Practice
- Electrical power
- Location
- Dallas, TX
- Service
- Load analysis, feeder sizing
- Client
- Confidential
Load Analysis and Feeder Design for 200 A Lot Upgrades at a Manufactured Home Community, Dallas (2019 to 2020)
The owner of a manufactured home community in Dallas planned to bring its lots up to 200 A service. From June 2019 to August 2020 we issued six interim review sets of the electrical design for the upgrade.
Sizing for diversity
The load summary treats each 200 A lot as 47.8 kVA connected and applies a demand factor of 0.24 across 26 lots, for 299 kVA. A 48 kVA community panel, for loads such as the pool, brings the design load to 347 kVA, or 1,446 A at 240/120 V. Homes do not all draw their full load at once, and the demand factor keeps the service and the feeders to a practical size.
The distribution
The design takes the service from a utility transformer through a 1,600 A fused main. Six fused 350 A feeders of 300 kcmil aluminum, run overhead in free air for up to 520 feet, each serve a group of lots with demand loads of 263 to 329 A, and a 200 A feeder serves the community panel. Overhead taps drop from each feeder to the main breaker of each home, and the notes cap a home main breaker at 200 A.
The sets on file are interim review drawings marked not for construction.
Related services
See our load analysis and our electrical design services.
Electrical power
Related projects
San Antonio, TX
EV Charger Panel Design for a Condominium Garage, San Antonio
EV charging, electrical design
Dayton, Strawn and San Antonio, TX
RV Park Service and Feeder Sizing in Dayton, Strawn and San Antonio
Load analysis, feeder sizing
Pasadena, TX
Energy Use Estimate for Two Plant Office Buildings, Pasadena
Load analysis, energy estimate
More work in: Texas
Get your project started
We typically respond within one business day.