Baseline Pipe-to-Soil Survey and Current Requirement Tests on Two Water Mains, Guadalupe County Area (2026)
We typically respond within one business day.
Project at a glanceDE-PRJ-10881
- Practice
- Corrosion and CP
- Location
- Guadalupe County area, TX
- Service
- CP survey, current requirement tests
- Client
- Confidential
Baseline Pipe-to-Soil Survey and Current Requirement Tests on Two Water Mains, Guadalupe County Area (2026)
In 2026 a regional water authority asked us to test the cathodic protection on two of its water mains in the Guadalupe County area. One is a raw water distribution main with 71 mapped test stations and a spur; the other, with 23 stations, serves a power plant site.
Finding the stations
We worked from the alignments of both mains and a map layer of the oil and gas pipelines nearby. On the raw water main we took readings at 59 stations. Six could not be located, four were gone, one could not be reached because of livestock and one has no entry. On the spur, four stations could not be found on the right of way and are not in the GIS, and one was read. On the power plant main we read 19 of 23 stations; three could not be accessed and one was bent over.
What the readings show
Pipe-to-soil potentials on the raw water main ranged from -3 to -474 mV against a copper sulfate electrode, most of them between about -110 and -330 mV. The most negative reading was at a crossing with another pipeline, and two stations sit where the main runs beside a pipeline that has its own cathodic protection. On the power plant main most readings were between -274 and -447 mV, with one at -604 mV and one at -89 mV. Wires from foreign lines inside two test stations read -1,231 and -1,606 mV. All of the water main readings are well short of the -850 mV level commonly used as a protection criterion.
Current requirement tests
We applied temporary current at several points to see how the pipe responds. At one station on the power plant main, 160 mA moved the potential to -380 mV on, with -324 mV instant off, and the pipe was polarizing well. At another, 152 mA reached only -470 mV. On the raw water main, a section took 500 mA to reach -1 V and was polarizing.
Related services
This is the first step of our cathodic protection potential surveys, starting from a native potential survey, and it feeds CP design where protection has to be added.
Corrosion and CP
Related projects
El Paso, TX
Baseline CP Surveys at Two Power Stations, El Paso
CP surveys, rectifiers
Denton, TX
Annual Gas Piping CP Surveys at a Power Plant, Denton
Annual CP surveys
Wichita Falls, TX
Fire Water Piping and Tank CP Survey at a Glass Plant, Wichita Falls
CP survey, continuity testing
More work in: Texas
Get your project started
We typically respond within one business day.